1 |
Parco |
Re Route of 18” Dia MFM Diesel Pipeline at Trimoo
Head Jhang, Pakistan |
Jhang, Punjab |
2 |
Parco |
Supply of 1500 meter 18” Dia SAWH, line pipe |
0Karachi |
3 |
Al Tariq Cpnst.(ATL) |
Construction of Storage tank Dia 15 meter for ATL at
their National Refinery Limited (NRL) Project. |
Karachi |
4 |
PPL |
Supply, Fabrication & Erection of Lube Oil Shed at
West Wharf Store |
Karachi |
5 |
PPL |
Supply, Fabrication & Erection of Foreign Purchase
Shed at West Wharf Store |
Karachi |
6 |
PARCO |
Sludge Cleaning, Garnet Blasting & Re-Paint work on
Internal Surface of Crude Oil Tank (A-003) |
Korangi, Karachi |
7 |
PARCO |
Repair work, Garnet Blasting & Re-Paint work on
External surface of Crude Oil Tank (A-003) |
Korangi, Karachi |
8 |
PPL |
Fabrication Welding for Installation of BY-Pass Line at 3
Phase test Separator and Tie-in at Chachar Gas Field |
Kandh Kot, Sindh |
9 |
PPL |
Supply, Fabrication & Placing of Steel Pipe Racks for
Kandh Kot Stores at Kandh Kot Gas Filed |
Kandh Kot, Sindh |
10 |
PPL |
Civil Construction of Examination Hall Building at Govt.
Boys High School Naban Janjua Near Adhi Gas Field |
Doltala, Punjab |
11 |
PARCO |
Supply (Import) & Installation of SS Razor Wire on
Boundary wall along with all allied materials at PARCO
Refinery PS-1 |
Korangi, Karachi |
12 |
PARCO |
Supply (Import) & Installation of SS Razor Wire on
Boundary wall along with all allied materials at PAPCO
Refinery |
Bin Qasim, Karachi |
13 |
Archroma Pakistan |
Fabrication, Welding & Supply of Expansion Tank at
Archroma Factory |
Jamshoro, Sindh |
14 |
Kazmi Engineering |
Annual Shut Down of LPG Air Mix Assembly (20
MMBTU / Hr) at M/s Lasbela Gas (Pvt) Limited |
Karachi |
15 |
Kazmi Engineering |
Maintenance, sand Blasting & Re-Paint work on LPG
Vessels at M/s MECOM Gas LPG Plant |
Bin Qasim, Karachi |
16 |
Techno Engineering |
Fabrication, Erection & Paint work along will all
support 6” ~ 12” dia NG Pipe Line at OGDCL Plant |
Kabirwala, Punjab |
17 |
Techno Engineering |
Fabrication, Welding, Sand Blasting & Painting of
Crude Oil Tank OGDCL Plant |
Kabirwala, Punjab |
18 |
PSO (LMT) |
Annual Contract of Paint work on Tanks, Piping,
Pumps, Sheds and all building |
Korangi, Karachi |
19 |
PSO (KTB) |
Civil Repair work of Fire Water Tanks, Re-Plaster work,
Re-Paint work, Kanopi work & Mesh on Top |
Kemmari, Karachi |
20 |
Archroma Pakistan |
Supply, Fabrication, Installation of Complete Fire
Fighting Loop along with steel Structure work |
Jamshoro, Sindh |
21 |
Crecent Steel & Allied Product |
Civil Construction of Complete Buildings of Supervisor
Bungalow at Crescent Steel Factory |
Nooriabad, Sindh |
22 |
Crecent Steel & Allied Product |
Civil Construction of Complete 3 Story Building of
Workers’ Hostel at Crescent Steel Factory |
Nooriabad, Sindh |
23 |
Kazmi Engineering |
Boring of Ø 6” Well For CP Anode with Anode
Installation |
MECOM GAS, Bin
Qasim Karachi |
24 |
Kazmi Engineering |
Sand Blasting and Painting of LPG Bullets (03 Nos.) |
MECOM GAS, Bin
Qasim Karachi |
25 |
Techno E Power |
Supply, Fabrication, Installation, Testing &
Commissioning of Natural Gas C.S Piping |
Techno E Power,
Faisalabad |
26 |
Techno E Power |
Supply, Fabrication, Erection, Welding, Inspection of
Fuel Storage Tanks |
Techno E Power,
Faisalabad |
27 |
Kazmi Engineering |
Annual Shut Down of LPG Air Mix Assembly
(20MMBTU/ Hr) |
Lessbela Gas LPG
Plant Hub, BST |
28 |
Kazmi Engineering |
Maintenance, Sand Blasting & Re-Paint work on LPG
Vessels |
MECOM GAS, Bin
Qasim Karachi |
29 |
Metallic Solution |
Sand Blasting & Epoxy Paint work of Chemical Storage
Tanks |
Lahore |
30 |
Metallic Solution |
Fabrication and supply of Chemical Tank according to
according to Customer Provided Drawing |
Lahore |
31 |
Kazmi Engineering |
Construction of Office Building, Labour
Accommodation Block over the backfilling and
compaction 10000 M³ of Plant Area |
Kiran Gas (Pvt)
Limited |
32 |
Kazmi Engineering |
LPG Bullets RCC Foundation and Miscellaneous Civil
Work |
MECOM GAS, Bin
Qasim Karachi |
33 |
Rana Brother Engineering |
Fabrication & laying of underground Pipeline (Sch 80)
Dia 8” as per API-1104 |
Byco Petroleum
Karachi |
34 |
Rana Brother Engineering |
Supply, Rolling, Fabrication, Erection, Testing &
Commissioning of Ethanol Tank |
United Ethanol
Project, Sadiaqabad |
35 |
Rana Brother Engineering |
Supply, Fabrication & Erection of CS (Sch 40 all allied
Piping work of Ethanol Plant Ø 2” upto 12 |
United Ethanol
Project, Sadiaqabad |
36 |
Rana Brother Engineering |
Fabrication & Erection of Steel Structure Pipe Rack for
Pipe Lines |
United Ethanol
Project, Sadiaqabad |